Renovation Packages in Singapore: What They Include

Why two packages at the same headline price can be very different jobs.

A package is a scope, not a price

The headline number on a renovation package is meaningless without the scope schedule behind it. Two packages quoted at the same figure differ in carpentry run length, the number of electrical points, whether hacking and debris removal are included, and what grade of materials is assumed. TO FILL: package scope comparison by flat type

Supply, install, or supply-and-install

Every line in a quotation is one of three things: supply only, labour to install an item you provide, or supply-and-install. A quotation that does not state which is not comparable to one that does, and this ambiguity is the single most common source of renovation disputes.

Provisional sums and what they hide

A provisional sum is a placeholder for work whose extent is not yet known. It is legitimate for genuinely unknown items, and a way to make a total look smaller when used for known ones.

How payment should be structured

CaseTrust caps the initial deposit a renovation business may collect at a maximum of 20% of the total contract cost, requires payments to be collected in phases against agreed milestones, and requires a deposit performance bond safeguarding those payments against closure, winding up and liquidation (CASE). Noble Interior Design Pte. Ltd. is CaseTrust-accredited and is bound by those terms.